Pharmaceutical Cleanroom & Packaging Suite — Brampton

By Buildup Contracting

Project featured image

Project type

Pharmaceutical cleanroom and packaging suite build-out inside an operating manufacturing facility.

Location

Brampton, Ontario.

Approximate scope

Roughly 20,000 square feet across a production hall, packaging suite, QA observation areas, and connecting corridors — delivered within a twelve-week construction window for the overall build.

Steel-stud framing with mould-resistant sheathing for a pharmaceutical cleanroom build-out in Brampton
Steel-stud partitions going up with mould-resistant sheathing — the layout for the production hall and packaging suite.

Buildup's role

Framing, drywall and ceilings across the suite: steel-stud partitions with mould-resistant sheathing, full board installation taped, skimmed and sanded to a Level 5 finish on every wall, and sealed T-bar ceiling systems throughout — delivered in coordination with the project's other trades.

Sealed T-bar ceiling grid and mechanical rough-in above a pharmaceutical cleanroom
Sealed T-bar ceiling grid with the mechanical rough-in above — closed up only after every service overhead was set.

The finish that matters: Level 5

Level 5 is the most demanding drywall finish there is: every surface skim-coated and sanded flat, because cleanroom lighting and washable coatings show every imperfection. Doing it wall-to-wall across 20,000 square feet — with dust containment inside an operating pharmaceutical facility, and partitions that had to stay perfectly true for the coatings and equipment that followed — left no room for rework.

Drywall taping in a cleanroom corridor during pharmaceutical facility construction
Taping and skim work through a cleanroom corridor — every wall carried to a Level 5 finish.
Self-leveling epoxy floor curing in a pharmaceutical cleanroom corridor
Self-levelling epoxy floor curing in a corridor — the finishing trades our walls and ceilings had to be ready for.
Cleanroom partition wall framing opening into the finished production hall
Partition framing opening into the finished production hall.

The finished suite

Partitions and ceilings delivered flat, sealed and ready for coating and validation — Level 5 on every wall of the suite.

Finished cleanroom with high-speed door and observation windows
Finished cleanroom with high-speed door and observation windows.
Completed cleanroom corridor with epoxy floor and viewing windows
Completed corridor — epoxy floor, sealed ceiling and viewing windows.

Timeline

Twelve-week construction window for the overall build, with framing, board and ceilings sequenced ahead of the finishing trades so downstream work never waited on a wall.

Outcome

Partitions and ceilings delivered flat, sealed and ready for coating and validation. The same finish discipline we bring to restaurant build-outs, where the wall you see from the dining room is the finish.

Packaging line installed behind the QA observation window in a completed pharmaceutical suite
The packaging line running behind the QA observation window in the completed suite.